NSPS Rail: Difference between revisions

From ReBoot23 N518 Wiki
JabicZF (talk | contribs)
Created page with "== NSPS National Metro == === Blue Line === As presently planned, the Blue Line will have ten (10) stations, with a Terminus in each Tirenbar & Ferrafield. The Ten Stations (as Presently Planned) will be as follows: * Tirenbar (Terminus) * Capitol Transport Hub * Capitol Downtown * Franklin’s Library * Jabic’s Stupid Megabase Southeast (Connection with the Red Line) * Volcano Community Hub * Franklin’s Castle * Spawn Town Transport Hub (Connection with the Green..."
 
JabicZF (talk | contribs)
No edit summary
 
Line 1: Line 1:
== NSPS National Metro ==
The '''National Server Postal Service''' '''Rail Office''' is a sub-division of the '''Office for Postal Transport''', which in turn reports to the '''Secretary for Postal Transport''', who is in turn appointed by the [[Postmaster-General]].


=== Blue Line ===
NSPS Rail oversees all rail-related projects undertaken by the NSPS.
As presently planned, the Blue Line will have ten (10) stations, with a Terminus in each Tirenbar & Ferrafield.


The Ten Stations (as Presently Planned) will be as follows:
== NSPS National Metro ==
 
<small>Main Article: [[NSPS National Metro]]</small>
* Tirenbar (Terminus)
[[File:NSPS Metro Map v4 - June 2026.png|none|thumb]]
* Capitol Transport Hub
* Capitol Downtown
* Franklin’s Library
* Jabic’s Stupid Megabase Southeast (Connection with the Red Line)
* Volcano Community Hub
* Franklin’s Castle
* Spawn Town Transport Hub (Connection with the Green Line)
* Northeast Spawn Town
* Ferrafield
 
=== Red Line ===
As presently planned, the Red Line will have four (4) stations, with a Terminus in each PJayEff’s Cave & Jabic’s Stupid Megabase Southeast
 
The Four Stations (as Presently Planned) will be as follows:


* PJayEff’s Cave
== NSPS Elevated Light Rail (ELR) ==
* Village
<small>Main Article: [[NSPS Elevated Light Rail]]</small>
* Jabic’s Stupid Megabase Northwest
[[File:NSPS ELR Map .png|none|thumb]]
* Jabic’s Stupid Megabase Southeast (Connection with the Blue Line)


=== Green Line ===
== NSPS Regional Rail: Mail Rail Transit (MRT) ==
As presently planned, the Green Line  will have three (3) stations, with a Terminus in each the Spawn Town Transport Hub &
The NSPS Initially proposed the construction of a Regional Rail Network, referred to as the Mail Rail Transit System (MRT), in January 2026, with Three Lines, all connecting at the JSM Transit Hub.
[[File:NSPS MRT Proposal Map 2026-01.png|none|thumb]]


The Three Stations (as Presently Planned) will be as follows:
== NSPS High Speed Rail (HSR) ==
The NSPS HSR System was initially proposed in January 2026, Alongside the MRT Project.


* Spawn Town Transport Hub (Connection with the Green Line)
Once constructed, it will feature parallel tracks, as well as station bypasses.
* Spawn Town Tunnels
* Bay Rail Depot


== Map ==
Ice Boats travelling on the Network will reach a maximum speed of 261.828 KM/H
[[File:National Metro Light Mode Mode.png|none|thumb|600x600px]]
[[File:NSPS HSR Proposal Map 2026-01.png|none|thumb]]
[[Category:Lore]]
[[Category:Lore]]
[[Category:Information]]
[[Category:Information]]

Latest revision as of 23:09, 8 June 2026

The National Server Postal Service Rail Office is a sub-division of the Office for Postal Transport, which in turn reports to the Secretary for Postal Transport, who is in turn appointed by the Postmaster-General.

NSPS Rail oversees all rail-related projects undertaken by the NSPS.

NSPS National Metro

Main Article: NSPS National Metro

NSPS Elevated Light Rail (ELR)

Main Article: NSPS Elevated Light Rail

NSPS Regional Rail: Mail Rail Transit (MRT)

The NSPS Initially proposed the construction of a Regional Rail Network, referred to as the Mail Rail Transit System (MRT), in January 2026, with Three Lines, all connecting at the JSM Transit Hub.

NSPS High Speed Rail (HSR)

The NSPS HSR System was initially proposed in January 2026, Alongside the MRT Project.

Once constructed, it will feature parallel tracks, as well as station bypasses.

Ice Boats travelling on the Network will reach a maximum speed of 261.828 KM/H